INFORMATION
At the end of the start-up of the appliance after installation, ask for informa
-
tion on operating the appliance and the security mechanisms.
The start-up of the appliance must be done definitely by the authorized
service.
2) Check the domestic water installation by opening the hot water tap. Look for any leakage in
the installation pipes.
3. The waste gas flue group must be assembled from the original parts in accordance with the
instructions.
IT IS IMPORTANT,
The electrical connection of the appliance must be connected to a grounded power supply line
which can provide enough voltage for the appliance (230V AC, 50Hz).
The gas line must be controlled by the authorized gas company and open.
After all these operations are completed, the authorized service must be called for the start-up of the
appliance.
In the event of a gas leak in your home, immediately
switch off the gas valve or the tube regulator. Ventilate
the place. Call the gas company or the authorized service.
21