INFORMATION
- When the water filling process is in progress, the installation
water pressure value is monitored in the pressure indicator
on the LCD screen of your appliance. The pressure value on
the LCD screen should be between 1-2bar. When this value is
reached, close the filling valve.
It is designed in a telescopic structure so that you can grasp
the filling tap better, you can use it more comfortably when
you pull the tap down.
* Responsibility for the inconveniences resulting from the use of different
brand thermostats will not be accepted.
* The room thermostat connection is visible on the electrical circuit
diagrams. (Page 5, Figure 1)
STARTUP AND USE
Last Controls and Actions to Perform Before the Start-Up
CAUTION:
Definitely close the water filling valve. If it is left
open, the installation water may leak and damage the envi
-
ronment.
CAUTION:
It is recommended that you do not use well
water, natural spring water, etc. except the mains water
to prevent calcification of the heat exchanger.
20
1) Filling water in the combi boiler and water installation
- First of all, the electrical connection of the combi boiler is made.
- All the radiator valves are opened.
- The valves of the supply and return lines of the combi boiler must be open. Check.
- After this, start the water filling process by opening the filling valve slowly.
- Whether or not there is air in the central heating circuit is checked from the purge valves on the
radiator. For fully efficient heating all air should be discharged from the installation.
- After the air discharge has been done, check the water pressure on the LCD screen again. In case
the pressure decrease, repeat the water filling procedure.
- Finally, check for leaks in the radiators, the installation pipes and the connections.