Miscellaneous
ICA362-4EN3.pdf
2012-06-12
Unlocking the articulation
1
3
4
2
Fig. Articulation in the open position
1. Locking arm
2. Locking pin
3. Locking stud
4. Locking lug
Remember to unlock the articulation before
operating.
Remember to unlock the articulation before
operating.
Fold the locking arm (1) back and secure it in the
locking lug (4) with the locking stud (3). Insert the
lowermost locking pin (2) fitted with a wire, to secure
the locking stud (3). The locking lug (4) is located on
the tractor frame.
Towing/Recovering
Towing
The roller can be moved up to 300 meters (1,000 ft)
using the instructions below.
2
2
1
1
Fig. Propulsion pump
1. Towing valve
2. Locknut
Alternative 1
Short distance towing with the engine running
Depress the emergency/parking brake knob and
temporarily shut off the engine. Chock the drums
to prevent the roller from moving
Depress the emergency/parking brake knob and
temporarily shut off the engine. Chock the drums
to prevent the roller from moving
Turn both towing valves (1) (middle hexagonal nut)
three turns counter clockwise, while holding the
multifunction valve (2) (lowermost hexagonal nut) in
place. The valves are placed on the forward drive
pump.
Start the engine and allow it to idle.
The roller can now be towed and can also be steered
if the steering system is otherwise functioning.
58
Summary of Contents for ICA362
Page 2: ......
Page 10: ...e ICA362 4EN3 pdf 2012 06 12...
Page 14: ...Introduction ICA362 4EN3 pdf 2012 06 12 4...
Page 18: ...Safety when operating ICA362 4EN3 pdf 2012 06 12 8...
Page 24: ...Special instructions ICA362 4EN3 pdf 2012 06 12 14...
Page 32: ...Technical specifications ICA362 4EN3 pdf 2012 06 12 22...
Page 64: ...Operation ICA362 4EN3 pdf 2012 06 12 54...
Page 72: ...Operating instructions Summary ICA362 4EN3 pdf 2012 06 12 62...
Page 74: ...Operating instructions Summary ICA362 4EN3 pdf 2012 06 12 64...
Page 76: ...Preventive maintenance ICA362 4EN3 pdf 2012 06 12 66...
Page 80: ...Maintenance Lubricants and symbols ICA362 4EN3 pdf 2012 06 12 70...
Page 86: ...Maintenance Maintenance schedule ICA362 4EN3 pdf 2012 06 12 76...
Page 98: ...Maintenance 50h ICA362 4EN3 pdf 2012 06 12 88...
Page 114: ...Maintenance 1000h ICA362 4EN3 pdf 2012 06 12 104...
Page 120: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden...
Page 121: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden...