Maintenance
8 — 2
07_0004_0608GB
The following table shows the intervals for the various maintenance
tasks.
Note
Have the initial after-sales service carried out by a Putzmeister
Mörtelmaschinen GmbH After Sales service engineer or by a dealer
authorised by Putzmeister Mörtelmaschinen GmbH.
Interval
Assembly
Inspection
criteria
Measure
Reference
daily
Safety equip-
ment
Visual inspec-
tion
Repair the safety
device
daily
Electric cabling
Visual inspec-
tion
Replace the electric
cabling
daily
High-pressure
gun trigger
Ease of move-
ment
Make sure the high-
pressure gun trigger
is fully functional
daily
Water filter
Cleanliness
Clean the water filter
Chapter
”Operation”
-- section:
”Cleaning
the machine”
daily
High-pressure
hose
Visual inspec-
tion
Replace the high-
pressure hose
50 h
High-pressure
water pump
Full oil change
Change the oil after
operating for the first
time
Chapter
”Mainten-
ance”
-- section:
Op-
erating materials”
150 h
Fan jet nozzle
Cleanliness,
wear
Clean or replace the
fan jet nozzle
High-pressure
water pump
Fluid level
Top up fluid
High-pressure
water pump
Check pump
valves
Clean or replace
pump valves
400 h
Water filter
Cleanliness
Replace the water
filter
Chapter
”Operation”
-- section:
”Cleaning
the machine”
Continued on following page
8.1
Maintenance intervals