Transport, Set-up and Connection
4 — 8
04_0011_0609GB
Electrical installation prerequisites should be checked by a qualified
electrician before connection work begins. Refer to the Directives
stipulated in BGI 608.
-- The connected load of the existing electrical installation must be
sufficient for the machine.
-- Connection may only be carried out at a specific feed point (e.g.
site power distribution point complying with VDE 0612). Please
refer to the technical data for the maximum back-up fuse values.
-- Operating voltage may not fall below the loads permissible under
VDE codes of practice.
-- Please refer to the technical data for the external device plug type.
-- All 3 phases and the PE (Potential Earth) protective conductor
must be present.
Continued on following page
Prerequisites