12
UVCS LED Light-Curing Conveyor Systems User Guide
3.
Lower the two controllers onto the emitters carefully (Figure 10).
Figure 10. Lower Controllers onto Emitters
4.
Install one screw on either side of the forward body of the emitter.
Figure 11. Install Screws
Figure 12. Close Up of Screw