Spin Welder User’s Manual
Section 2 – Unpacking
Page 9
Page 8
Dukane Manual Part Number 403-547-03
Dukane Manual Part Number 403-547-03
Unpacking System
The Spin Welder is normally packed in a corrugated
carton resting on a wooden shipping pallet. To un-
pack the Spin Welder follow these steps.
1. Remove the straps from the carton.
2. Open the top of the carton. Carefully remove any
packing materials, cables and documentation.
3. Cut the tape at the bottom corners and unfold
the flaps.
4. Remove the corrugated carton, but leave the Spin
Welder on the pallet.
5. Leave the power cable wrapped to the column
until after the Spin Welder has been placed in its
working area and you are ready to begin hooking
up power and air.
6. If you are supplying your own tooling, the Spin
Welder is shipped with the dovetail slide lock-
ing levers tightened (see Figure 2–3 or Figure
6–7). If you ordered custom tooling with your
Spin Welder, it may be installed with a sample
part under the tool hub for shipping. Leave the
locking levers tightened until the Spin Welder
has been installed in its work area.
Packing List
After removing the shipping container, check that
you have the items listed in Table 2–1. Inspect the
Spin Welder for damage. Report any damage im-
mediately to the carrier and to Dukane Ultrasonics
Service at 1-800-231-8404. Also see Section 10 for
information on contacting Dukane. Save all shipping
and packing materials so they can be inspected in
processing any claims that may arise.
WaRninG
DO NOT LIFT the Spin
Welder manually. Lift-
ing and/or moving the
welder manually could
result in personal injury.
Use mechanical means
to move and place the
Spin Welder.
Table 2–1
Spin Welder Shipping Contents
Qty
Item
Part Number
1
Spin Welder
SVB031 (3hp)
SVB 051 (5hp)
1
Base Interface
to Press Cable
200-1064
1
Spin Welder
User’s Manual
403-547-XX