12
screws for fixing the rack, bolts and nuts or bolts for fixing to the ground of the engine. Silicone to seal the holes
to run cables to the motor.
1. KIT ConTEnTS, ACCESSoRIES AnD TECHnICAL DATA
See table 1 & 2
Warning: the composition of the kit may vary depending on the version purchased.
There are special versions with ad hoc compositions. The table of this manual is for guidance only and does not
represent the totality of the available versions.
2. oPERATIng LIMITS
Ensure that the dimensions of the engine are compatible with the structure. Fig.3
Make sure that the weight limits and length of the engine are compatible with the gate. TABLE 2
ATTEnTIon:
The drive is suitable for sliding gates installed in a workmanlike manner with excellent balance and
linear motion without friction.
If the gate is not up to standard, it cannot be automated.
If manual handling is not linear and smooth without major points of friction the gate can’t be automated
The automation system cannot compensate for defects in the structure. Make sure the gate is in compliance with
the general or local safety standards.
DAngER WARnIng:
The gate must have some mechanical limit stop
(end-of-travel-limits)
with setback.
Otherwise the gate is dangerous and could derail from the track causing a serious risk danger to persons or
property.
DAngER WARnIng:
in the absence of mechanical stops do not automate and not even manually move the
gate but please report immediately to a specialist for the put to norm of the structure.
The manufacturer is not liable for damage caused by incorrect installation of structures unfit or unsafe.
3. PRELIMInARY PREPARATIonS
To power the engine a specialist operator shall prepare (except for solar-powered kit) the Supply Electric cable
230V 50Hz (or 110V 60H) with output at the point where the engine will be fixed to the ground.
To check the fixing position of the motor to the ground see Figure 2-4-7C-10-11
Provide ducts for cables and related accessories cable mm 0.25 mm²
DAngER WARnIng:
The connection of the high voltage 230V 50Hz (or 110V 60Hz) must only be carried out
by suitably qualified and certified electrician.
The other low voltage electrical connections can also be made by any operator, as low voltage, present no
danger of electric shock.
4. MoToR FIXIng PoSITIon: RIgHT oR LEFT SIDE oF THE gATE
The motor must be positioned on the ground, parallel to the gate, a small pedestal in concrete or brick.
An optional “mounting plate” is also avalable fo reasier motor position adjustment. Optional accessory PLAK
8700 (GASL001). Fig. 5A-5B
The engine must be installed inside the property at the level of the column corresponding to the opening side of
the door. FIG 2 and 4A-4B
It is important to calculate the fixing position of the motor in accordance with the measures and limits set by the
FIG.7C
The optional accessory PLAK8700 is recommended because it allows you to adjust the longitudinal and lateral
position of the motor to the rack that will be fitted to the gate.
The engine shall be placed parallel to the gate and perfectly horizontally. Figure 2
5. EngInE CABLE ConnECTIon: gate that opens to the right or to the left
Automation is wired for STANDARD opening. We consider standard a gate that opens to to the right (seen from
the inside of the Property):
if the gate open to the left is necessary to reverse the polarity of the motor cables red and blue being careful not
to damage the blades brush holders. Fig.4a-4B
6. gRoUnF MoToR FIXIng
After determining the correct fixing position and height of the engine and having prepared the conduits for the
passage of cables, place the motor in the final fixing position (if the engine is fastened to the ground without
adjustment plate, a base should be perfectly linear plan. Attach the motor to the base by means of special bolts
(not supplied). In case of using the optional fixing plate cemented it to the ground. FIG. 5A-B-C