Cafitesse 100 Next Generation
Functions - dosing system
5C-8
August 2009
Disassembly of the valve seal and impeller
Use a screwdriver to loosen the 5 dump bells
(26) from the valve seat (27) and remove the
seat (fig. 8).
Remove the sealing (28).
Use a screwdriver to undo the impeller (29)
through the bottom opening of the rear mixing
bowl (30) (fig. 9).
Disassembly of the mixing unit motor
Unhook the snap-fit (31) of the mixer motor
mounting flange (fig. 10).
(fig. 10).
.
Turn the mixer motor (32) counterclockwise and
take it off from the rear mixing bowl (fig. 10).
Undo the 3 screws (33) and remove the mixer
motor (fig. 11).
Push the mixing unit motor seal (34) through the
rear mixing bowl (fig. 11).
Note:
The reassembly is carried out in
reverse order.
•
•
•
•
•
•
•
Fig. 8
26
27
28
Fig. 9
29
30
Fig. 10
31
32
Fig. 11
33
34
Summary of Contents for Cafitesse 110
Page 2: ... 2009 Douwe Egberts Coffee Systems International DRAFT Version August 2009 D R A F T ...
Page 22: ...D R A F T Cafitesse 100 Next Generation Installation Putting into operation 2 20 August 2009 ...
Page 54: ...Cafitesse 100 Next Generation Programming 4 20 August 2009 ...
Page 58: ...D R A F T Cafitesse 100 Next Generation Functions Overview of assemblies 5 August 2009 ...
Page 71: ...Cafitesse 100 Next Generation Functions water system August 2009 5A 13 ...
Page 82: ...Cafitesse 100 Next Generation Functions dosing system 5C 10 August 2009 ...
Page 93: ......