5G-3
G.2.2 Disassembly of the dispenser door including circuit board
Disconnect the dispenser from the power supply
system and close the water tap.
Remove the cuptray and the driptray and open
pen
the dispenser door.
Undo 2 releasable rivets at the splash panel and
remove the overflow hose on the inside of the
splash panel (see chapter A.2.2)..
Remove the splash panel together with the cover
fluid treatment (see chapter �.2.2).
(see chapter A.2.2).
see chapter A.2.2).)..
Unscrew the door stop on the top and remove
the cover plate of the dispenser (see chapter
A.2.3)
Tilt up the complete cooling compartment (see
ilt up the complete cooling compartment (see
see
chapter A.2.3).).
Push the nozzle (2) through the hole (3) (fig. 1).
Unplug the cable harness door from the main
control board (4) and pull it through the hole (fig
1).
Undo 4 screws (1) and pull the door out of the
hinges (fig. 1).
Remove the door and put it on a soft mat to
avoid scratches.
The reassembly is carried out in reverse order.
Disassembly of the circuit boards
ATTENTION:
During the replacement of the
circuit boards always work with
ESD-protection (e. g. use an ESD
wristband), in order to prevent
damage to the PC boards and their
components due to electric charge.
Undo 7 screws on the door and remove the door
inlay. (fig. 2)
Undo 2 screws (5) of the user interface board (6)
(fig. 3).
Undo the 2 flat strip cables (7) (fig. 3).
Undo the foil cable (8) and take off the user
interface board (fig. 3).
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Fig. 1
1
2
3
4
Fig. 2
Fig. 3
5
6
8
7
Summary of Contents for Cafitesse 110
Page 2: ... 2009 Douwe Egberts Coffee Systems International DRAFT Version August 2009 D R A F T ...
Page 22: ...D R A F T Cafitesse 100 Next Generation Installation Putting into operation 2 20 August 2009 ...
Page 54: ...Cafitesse 100 Next Generation Programming 4 20 August 2009 ...
Page 58: ...D R A F T Cafitesse 100 Next Generation Functions Overview of assemblies 5 August 2009 ...
Page 71: ...Cafitesse 100 Next Generation Functions water system August 2009 5A 13 ...
Page 82: ...Cafitesse 100 Next Generation Functions dosing system 5C 10 August 2009 ...
Page 93: ......