Cafitesse 100 Next Generation
Functions - water system
August 2009
5A-9
Fig. 3
Undo the 2 screws on the front of the cooling
compartment (see chapter A.2.3)..
Tilt up the complete cooling compartment (see
see
chapter A.2.3).).
Extract the 2 bolts from the cavity on each side
of the inside wall and place it in the adjacent
hole to support the cooling compartment (see
see
chapter A.2.3).).
Pull the cable harness(es) heating elements
upwards to the boiler lid (fig. 1).
Undo the 2 flat connectors of the temperature
sensor (see chapter 2.4).
Remove the connector from the level sensor
(see chapter 2.4).
Disassembly of the boiler lid
Undo the 4 screws (4) on the boiler lid (fig. 3).
Remove the hose clamp and undo the water
inlet hose (5) from the boiler lid (fig. 3).
Unfix the 2 clamps on the boiler lid and remove
the boiler lid.
•
•
•
•
•
•
•
•
•
4
5
4
Summary of Contents for Cafitesse 110
Page 2: ... 2009 Douwe Egberts Coffee Systems International DRAFT Version August 2009 D R A F T ...
Page 22: ...D R A F T Cafitesse 100 Next Generation Installation Putting into operation 2 20 August 2009 ...
Page 54: ...Cafitesse 100 Next Generation Programming 4 20 August 2009 ...
Page 58: ...D R A F T Cafitesse 100 Next Generation Functions Overview of assemblies 5 August 2009 ...
Page 71: ...Cafitesse 100 Next Generation Functions water system August 2009 5A 13 ...
Page 82: ...Cafitesse 100 Next Generation Functions dosing system 5C 10 August 2009 ...
Page 93: ......