Cafitesse 100 Next Generation
Functions - power supply and control system
August 2009
5K-5
Disassembly of the switch mode power pack
ATTENTION:
During the replacement of the
circuit boards always work with
ESD-protection (e. g. use an ESD
wristband), in order to prevent
damage to the PC boards and their
components due to electric charge.
Undo 1 screw on the side of the switch mode
power pack (fig. 7).
Remove the switch mode power pack together
with the cooler sheet.
Undo the connector (8) of the switch mode pow-
er pack. (fig 8).
Undo the 2 screws (9) and remove the SMPP
board from the spacers (fig. 7).
Disassembly of the multi relais board
Pull the multi relais board out off the spacers (fig.
9).
Undo the connector of the multi relais board.
•
•
•
•
•
•
Fig. 6
Fig. 7
9
Fig. 6
Fig. 9
Fig. 8
8
Summary of Contents for Cafitesse 110
Page 2: ... 2009 Douwe Egberts Coffee Systems International DRAFT Version August 2009 D R A F T ...
Page 22: ...D R A F T Cafitesse 100 Next Generation Installation Putting into operation 2 20 August 2009 ...
Page 54: ...Cafitesse 100 Next Generation Programming 4 20 August 2009 ...
Page 58: ...D R A F T Cafitesse 100 Next Generation Functions Overview of assemblies 5 August 2009 ...
Page 71: ...Cafitesse 100 Next Generation Functions water system August 2009 5A 13 ...
Page 82: ...Cafitesse 100 Next Generation Functions dosing system 5C 10 August 2009 ...
Page 93: ......