DRAFT
Installation / Putting into operation
Cafitesse 100 Next Generation
August 2009
2 - 17
Connect the dispenser / initialization
The dispenser is suitable for the installation on a
flat horizontal counter, table, base stand or a table
against a wall (fig. 2).
At the rear of the dispenser, a minimum free space
of 50mm / 2.0 in is necessary to ensure sufficient
cooling.
Place the dispenser on the table.
If required, install customer specific kits, e.g.
a payment side module. Please refer to the
respecitive installation instructions, which are
delivered with the kit.
Connect the dispenser to the water supply.
Ensure that the water stop valve
connected to the supply line seales
properly.
If the dispenser is equipped for the delivery of
cold drinks or cold water (option), install the
water connection for the cold water inlet valves,
use a pressure limiter.
Open the water tap (fig. 3).
Plug in the mains plug (fig. 3).
The dispenser now starts operation:
The water is running into the boiler until it is
filled. This takes about 1 minute.
The display of the dispenser starts, you can see
the highlighted ‚TEMPERATURE‘-icon (
1
) on the
dark background (fig. 4).
The dispenser heats up the water in the boiler.
Depending on the heating capacity of the
dispenser type, the heating up takes 20 minutes or
more.
•
•
•
•
•
•
•
•
Fig. 2
Fig.
Fig.
1
Summary of Contents for Cafitesse 110
Page 2: ... 2009 Douwe Egberts Coffee Systems International DRAFT Version August 2009 D R A F T ...
Page 22: ...D R A F T Cafitesse 100 Next Generation Installation Putting into operation 2 20 August 2009 ...
Page 54: ...Cafitesse 100 Next Generation Programming 4 20 August 2009 ...
Page 58: ...D R A F T Cafitesse 100 Next Generation Functions Overview of assemblies 5 August 2009 ...
Page 71: ...Cafitesse 100 Next Generation Functions water system August 2009 5A 13 ...
Page 82: ...Cafitesse 100 Next Generation Functions dosing system 5C 10 August 2009 ...
Page 93: ......