46
999805002 - 09/2018
Assembling towers in the upright
User Information
Load-bearing tower Staxo 40
Raising the 'move-up' railings
1)
Push the Staxo front railings down into the stand-by
position.
2)
Move the Staxo side railings up one section ('sto-
rey').
3)
Move the Staxo front railings up again.
Mounting the scaffold planking units
➤
Insert scaffold planking units.
➤
Close the anti-liftout guard.
➤
Insert Staxo 40 couplers in the same way as in the
first 'storey'.
Erecting further storeys
➤
Add further frames in the same way as for the 2nd
'storey', and brace them in the vertical with diagonal
crosses.
G
Scaffold planking 30/...cm
H
Scaffold planking 60/...cm with manhole
980 - -01
24 319
1
3
2
2
980 - -01
24 318
H
98024-295-01
NOTICE
Make sure that the manholes are in the right
position.
980 - -01
24 317