User Information
Load-bearing tower Staxo 40
Assembling towers in the upright
43
999805002 - 09/2018
Head zone
Fitting the head unit
➤
Insert the head unit.
Dismantling
To dismantle, perform the above steps in reverse order.
J
Head unit
WARNING
Loads that are applied non-centrally can cause
overloading of the system.
➤
Ensure that all loads are applied centrally!
NOTICE
➤
When lifting and repositioning the entire
tower unit (or pre-assembled sub-units) by
crane: Follow the instructions in the section
headed 'Lifting by crane'!
980024-253-01
J
9776-102-01
NOTICE
As early as in the planning phase, considera-
tion should also be given to the dismantling
operations (e.g. travelling/towing the load-
bearing tower/unit into the reach of the crane
for safe repositioning or for horizontal on-
ground dismantling)!