User Information
Load-bearing tower Staxo 40
Horizontal assembly
35
999805002 - 09/2018
Horizontal assembly
Preliminary remark:
▪
The terms 'vertical' and 'horizontal' (e.g. referring to
the diagonal crosses) are always used here with ref-
erence to their installation situation in the finished,
upright tower.
▪
The job of erecting the load-bearing tower begins
with the bottom (i.e. first) 'storey'.
Erecting the first storey
➤
Having regard to the instructions given above, place
the tower frames on their sides on timber supports
(min. 4cm high).
Bracing the frames in the vertical
➤
Link the frames with diagonal crosses.
Plan-bracing the frames (in the horizontal)
➤
Slot diagonal crosses onto the safety-catch bolts of
the horizontal frame tubes, and fix them in place.
➤
Insert screwjack base units and secure them with
Staxo 40 anti-dropout locks. See also the section
entitled 'Lifting by crane'.
Close-up
NOTICE
General:
▪
Slide the diagonal cross onto the safety-
catch bolt and immediately secure it with the
safety catch.
F
Diagonal cross
98024-217-02
F
F
98024-217-01
Basic rule:
To maintain correct geometry, horizontally placed
Diagonal crosses 12.xxx or shear-rigid planking units
must be fitted in the following cases:
▪
in the bottom and top 'storeys'
▪
every 10 m
▪
in between as required, e.g. where
- there is a horizontal restraint for the tower
(even a temporary one)
- local loads need to be transferred (e.g. from a
bracket or from attaching the tower to the crane
when it is assembled in the horizontal)
D
Frame
E
Yellow locking spring
K
Diagonal cross
K
D
98024-216-01
E
98024-232-01
E