DPC Touch User Manual
10
6.
NEW JOB CREATION
While in Job Manager screen, press NEW button. New job will be created and placed in the end of
the list. New job creation screen will be displayed automatically.
A job is represented by a sequence of steps. These steps can be organized in any order which
corresponds to the desired production sequence. There are 5 types of steps and each one of them
can be used multiple times if necessary.
-
Fastening
: this step contains fastening positions including information associated with these
positions (positioning tolerance, tightening program, tightening time, etc.)
-
Logical In
: this step is used to verify an input signal in order to pass to the next step (e.g.
signals from proximity sensors, buttons, etc.).
-
Logical Out
: this step is used to send an output signal(s) to manage automation equipment
on work station (e.g. activation of pneumatic valves, lights, etc.).
-
Delay
: this step allows to maintain t
he current state of I/O’s for specified
time (e.g. a delay
required between receiving an input signal and sending an output signal).
-
Message
: this step is used to display a graphical or text message on the operating screen
during working cycle.
A job may contain up to 255 steps. The maximum number of positions in a single fastening step is 99.
In order to change sequence of steps in a job, tap one more time on the selected step and then
change its position in the list by using
Up
and
Down
buttons.
Created steps can be modified by using EDIT button or deleted by using DELETE button. COPY button
creates a copy of the selected step and inserts it in the end of the list.
Press SAVE button to save the job or CANCEL button to quit programming without saving changes.