115
V
PU
SH
TO
tech
nici
an
u
Permanently attach the operator to the concrete pad
using six (6) 3/8” x 3” sleeve anchors (not supplied).
IMPORTANT:
Center mounted
sleeve anchors are
REQUIRED
to prevent
chassis from flexing during operation.
Sleeve Anchor
(Not supplied)
3/8
Elbow
Assembly
Gate Bracket
Crank Arm
Control Arm
Release hub with release tool.
DO NOT REMOVE HUB!
Bolt crank arm to operator.
Slide elbow assembly on crank arm.
Bolt control arm to gate bracket.
Slide control arm into elbow assembly.
KEEP ARM ASSEMBLY LEVEL
.
Bolt gate bracket to gate.
1.6 Attach Gate Bracket
CAUTION
DO NOT REMOVE HUB!
A
A
D
F
F
E
E
D
B
C
C
B
Gate
Bracket
Control Arm
D
31”
Arm assembly and gate bracket
MUST
be level for gate to function correctly.
1.5 Securing Operator to Pad
6524-065-R-12-17
14