v
DiViS
30
5-3. PTZ Control
Prior to control PTZ function of camera(s), proper camera and setting must be done.
1.
Select a camera to control PTZ using
Channel Selection buttons
.
2.
Press
PTZ
or
ENTER
button on the front panel to enter PTZ control mode (press
ENTER
on the remote
controller). Depending on the security setting, the user might be prompted for password verification. Note that
PTZ control can be limited by user authority. PTZ mode icon ( ) will be displayed on the top-left corner of the
screen.
3. PAN/TILT
Press direction buttons to move cameras to respective directions.
4. ZOOM
Press
FF
or
REW
( ) on the front panel to zoom in or out (press on the remote
controller).
5. FOCUS
Press
PLAY/PAUSE
or
STOP
( ) on the front panel to adjust focus (press on the
remote controller).
6.
To exit from PTZ control mode, press
ENTER
. The PTZ mode icon will be disappeared.
5-4. Recording Options
DiViS CHSM48016
is capable to record 16 channels of video and audio simultaneously, real-time (30 FPS) for
each channel. Also each channel can be independently configured for its resolution, recording quality, frame rate,
audio recording and so on. Also recording mode can be selected individually.
Recording can be initiated by manually, by triggered event of motion detection or alarm input, or by weekly or daily
schedule created by user.
Recording Mode
Description
Manual
While recording mode is set to manual, recording starts or stops by
REC/STOP
button on the front panel or
REC
button on the remote
controller. Note that Manual recording enabled by schedule cannot be
turned off by
REC/STOP
or
REC
button
Event
While recording mode is set to event, recording is triggered by event
assigned for each channel from event setting.
Schedule (Weekly)
While recording mode is set to schedule, recording automatically starts
or stops following the pre-scheduled plan. For weekdays, Monday
through Friday can be scheduled by 24 hours per day, and each
segment (unit of an hour) can be set not to record, manual or event.
Schedule (Daily)
From the first day of the month to the last day, each days schedule can
be planned and executed.