6 Performing Other Network Tests
AIM User’s Manual
57
Performing a SWiM LF Power Test
You can use the AIM’s SWiM LF Power test feature to determine whether there is a
communications problem between the SWiM and the IRD. To perform this test,
disconnect all IRDs in the distribution network, then connect the AIM in place of an
IRD. The AIM determines whether the SWiM LF Power level is sufficient.
To perform a SWiM LF Power test:
1
Start the job for the installation (“Starting a Job” on
page
31
).
2
From the
HOME
screen, press
TEST
to go to the
TEST
screen.
3
Use
c
or
d
to highlight
SWiM LF Power Test
and press
SELECT
to go to the
SWiM LF POWER TEST
screen.
4
Disconnect all IRDs in the distribution network. Then connect the AIM in place of
an IRD.
5
Press
NEXT
and wait briefly for the results of the test.