![Diamond SmartLyte Plus Service Manual Download Page 51](http://html.mh-extra.com/html/diamond/smartlyte-plus/smartlyte-plus_service-manual_2493456051.webp)
2 Scheduled Maintenance
ECO 9099 SOP05-5090F Rev.00 Effective Date: 12/20/18 Page 51 of 58
2. Scheduled Maintenance
Maintenance procedures for the SmartLyte
®
Plus Electrolyte Analyzer require minimal time by the
operator to perform. The procedures outlined below should be performed according to the schedule
indicated. Detailed instructions for these procedures can be found in the Operator's Manual describing the
correct method to perform routine analyzer maintenance.
2.1. Daily
- Perform cleaning cycle at end of the day.
- Perform conditioning cycle at end of the day.
- Check printer paper supply.
2.2. Weekly Maintenance
- Clean sample probe and fill port.
- Clean exterior analyzer surfaces.
2.3. Monthly Maintenance
-Clean reference electrode housing.
2.4. Six Month Maintenance
-Replace peristaltic pump tubing.
2.5. Annual Preventive Maintenance
- Replace main tubing harness.
- Replace fill port assembly.
- Replace sample probe.
- Replace sample sensor Quad-ring.
Summary of Contents for SmartLyte Plus
Page 1: ......