1 Introduction
ECO 9099 SOP05-5090F Rev.00 Effective Date: 12/20/18 Page 42 of 58
1.4.6. Pinch Valve Tubing Set (AV-BP5193)
The pinch valve tubing set contains all tubing required for the analyzer. The tubing set has a pre-
cut tubing, a harness with fluidic interconnections preassembled. The Peristaltic Pump Tubing,
AV-BP5027D
, is also included in the set. (
Figure 1-60 Pinch Valve Tubing Set Diagram
Replacement of the tube set should be performed annually. Follow the procedure below;
1. Place the instrument in Hold in Maintenance mode to prevent reagents from cycling.
(Main Operations Menu>>>Maintenance>>>Hold in Maintenance)
2. Remove the Fluid Pack from the reagent compartment.
3. Next, follow the procedure outlined in
to remove the indicator cap and crimp
pin from each solenoid valve. This facilitates the removal of tubing from each solenoid.
4. Pull the two pump tubes of the peristaltic pump tube set off the pump rotor.
5. Unplug the reference from the connector. Use a towel to absorb any reference solution that
leaks from the housing
6. Pull out the white reference solution tube connector.
7. Gasp the front of the white TPR block and slide it out of the analyzer towards you.
8. Disconnect the green tagged tube from the electrode tray and the red tagged tube from the
bottom of the fill port.
9. Remove and discard all tubes.
10. Remove parts from the tubing kit which include the tubing harness, green tagged waste tube
and Peristaltic Pump Tubing separately.
11. Connect the green tagged tube to the electrode tray as shown in
Waste Out
< --Waste In
Reference Out
↑
Reference
In
Summary of Contents for SmartLyte Plus