DLPT2+
Operating Instructions
34
measured value that occurred during the two
tests is displayed for approximately 2s.
Note: There is no factory programmed test limit
for the 3 phase Rpe measurement and so
no tick or cross is displayed.
•
The DLPT2+ will then display the current flowing
in the protective conductor of the 3 phase
supply.
•
The 3-Phase leakage test will run for 30 seconds
but can be stopped earlier by pressing the 3-
Phase button.
Note: If the 3-Phase key is pressed while no
adaptor is connected to the DLPT2+ then a
warning message PLUG IN 3 PH ADPTR
will be displayed.
Summary of Contents for DLPT2+
Page 1: ......
Page 9: ...DLPT2 Operating Instructions 9 Figure 1 DLPT2 Front View ...
Page 11: ...DLPT2 Operating Instructions 11 Figure 4 Testing CLII appliances no mains leakage ...
Page 12: ...DLPT2 Operating Instructions 12 Figure 5 Testing CLI appliances mains leakage ...
Page 13: ...DLPT2 Operating Instructions 13 Figure 6 Testing CLII appliances mains leakage ...
Page 14: ...DLPT2 Operating Instructions 14 Figure 7 Testing IEC Leads ...
Page 15: ...DLPT2 Operating Instructions 15 Figure 8 Testing Installation RCD ...
Page 16: ...DLPT2 Operating Instructions 16 Figure 9 Testing Plug Top RCD ...