3.8
Performing an RCD test on an installation
RCD
When performing an RCD test ensure that
the Continuity Test probe is disconnected
from the DLPT2+
Equipment which is connected
downstream of the RCD may cause
measurement inaccuracies.
Voltages between the protective conductor
and earth may influence measurements.
Leakage currents in the circuit may
influence measurements.
Potential fields of other earthing
installations may influence the
measurement.
The DLPT2+ can be used to measure the operating
time of an installation RCD.
Connect the DLPT2+ IEC lead to the IEC socket of
the DLPT2+ and a mains outlet on the RCD
protected circuit.
To test the RCD operating time press the 30mA
RCD test key.
The mains supply status is checked and the status
is indicated using the LN, LE and NE enunciators of
the LCD.
LN
LE
NE
Mains status
Flash
Flash
OFF
No mains
OFF
Flash
Flash
Earth fault
Summary of Contents for DLPT2+
Page 1: ......
Page 9: ...DLPT2 Operating Instructions 9 Figure 1 DLPT2 Front View ...
Page 11: ...DLPT2 Operating Instructions 11 Figure 4 Testing CLII appliances no mains leakage ...
Page 12: ...DLPT2 Operating Instructions 12 Figure 5 Testing CLI appliances mains leakage ...
Page 13: ...DLPT2 Operating Instructions 13 Figure 6 Testing CLII appliances mains leakage ...
Page 14: ...DLPT2 Operating Instructions 14 Figure 7 Testing IEC Leads ...
Page 15: ...DLPT2 Operating Instructions 15 Figure 8 Testing Installation RCD ...
Page 16: ...DLPT2 Operating Instructions 16 Figure 9 Testing Plug Top RCD ...