Operating Instructions
30
3.6
Changing the Insulation Test Voltage
The Insulation test performed in the CLI and CLII
test sequences can be changed to 250V for
appliances with MOVs which would fail an Insulation
test performed at 500V.
In order to change the Insulation voltage press the
SETUP button to enter setup mode. Once in setup
mode press the CLII button, the selected insulation
voltage will be displayed next to the
Riso
enunciator.
To leave setup mode press the SETUP button.
3.7
Changing the CLI Leakage limit
The CLI Leakage pass/fail limit can be changed
between 0.75mA and 3.5mA.
In order to change the Leakage limit press the
SETUP button to enter setup mode. Once in setup
mode press the LKGE button, the selected pass/fail
limit will be displayed next to the
Ileak
enunciator.
To leave setup mode press the SETUP button.
Summary of Contents for DLPT2+
Page 1: ......
Page 9: ...DLPT2 Operating Instructions 9 Figure 1 DLPT2 Front View ...
Page 11: ...DLPT2 Operating Instructions 11 Figure 4 Testing CLII appliances no mains leakage ...
Page 12: ...DLPT2 Operating Instructions 12 Figure 5 Testing CLI appliances mains leakage ...
Page 13: ...DLPT2 Operating Instructions 13 Figure 6 Testing CLII appliances mains leakage ...
Page 14: ...DLPT2 Operating Instructions 14 Figure 7 Testing IEC Leads ...
Page 15: ...DLPT2 Operating Instructions 15 Figure 8 Testing Installation RCD ...
Page 16: ...DLPT2 Operating Instructions 16 Figure 9 Testing Plug Top RCD ...