DLPT2+
Operating Instructions
18
Power ON/OFF = press and hold CLI and CLII
simultaneously
Class I appliance test = press the CLI key
Class II appliance test = press the CLI key
Cord / extension lead test = press the CLI key
Enter Setup Mode = press the SETUP key
Once in the setup mode the CLII button can be used
to the change the Insulation voltage while the LKGE
button can be used to change the ILEAK pass/fail
limit. To leave the setup mode press the SETUP
button.
30mA RCD test = press the 30mA RCD key
3 phase appliance test = press the 3 phase key
Note: The DLPT2+ will automatically switch OFF
after approximately 1 minute if no keys are
pressed.
Note: When a key is pressed to initiate a test
sequence, the DLPT2+ will compare the type of
appliance connected with the test sequence that
has been selected, and where possible, will
prompt the user if an inappropriate test has been
selected.
For example, if an IEC lead is connected
between the front panel mains socket
and the
IEC socket on the end panel and a CLI appliance
test is selected, the DLPT2+ will flash the Cord
test enunciator to indicate that the Cord test is
the most appropriate test.
Summary of Contents for DLPT2+
Page 1: ......
Page 9: ...DLPT2 Operating Instructions 9 Figure 1 DLPT2 Front View ...
Page 11: ...DLPT2 Operating Instructions 11 Figure 4 Testing CLII appliances no mains leakage ...
Page 12: ...DLPT2 Operating Instructions 12 Figure 5 Testing CLI appliances mains leakage ...
Page 13: ...DLPT2 Operating Instructions 13 Figure 6 Testing CLII appliances mains leakage ...
Page 14: ...DLPT2 Operating Instructions 14 Figure 7 Testing IEC Leads ...
Page 15: ...DLPT2 Operating Instructions 15 Figure 8 Testing Installation RCD ...
Page 16: ...DLPT2 Operating Instructions 16 Figure 9 Testing Plug Top RCD ...