DLPT2+
Operating Instructions
21
•
If the measured value is less than the factory set
pass/fail threshold, the measured value is
displayed and the unit indicates a pass result, as
shown below.
Note: The DLPT2+ can perform a continuous Rpe
measurement (max 3 minutes). Press and
hold the CLI key for approximately 5s until
the unit emits a beep and the symbol
appears on the display. The DLPT2+
continuously
displays
the
current
measured value on the display and stores
the maximum value in the memory. By
pressing
the
CLI
key
again,
the
measurement is repeated with reversed
polarity. Press the key again to terminate
the Rpe test and display the maximum
value of RPE on the display.
•
The insulation test voltage is shown momentarily
next to the Riso enunciator.
•
The unit will proceed with the Insulation and
Leakage tests.
Note: The power switch on the appliance under
test must be in the ON position to perform
an insulation test. If no appliance is
detected the DLPT2+ will display the
following.
Summary of Contents for DLPT2+
Page 1: ......
Page 9: ...DLPT2 Operating Instructions 9 Figure 1 DLPT2 Front View ...
Page 11: ...DLPT2 Operating Instructions 11 Figure 4 Testing CLII appliances no mains leakage ...
Page 12: ...DLPT2 Operating Instructions 12 Figure 5 Testing CLI appliances mains leakage ...
Page 13: ...DLPT2 Operating Instructions 13 Figure 6 Testing CLII appliances mains leakage ...
Page 14: ...DLPT2 Operating Instructions 14 Figure 7 Testing IEC Leads ...
Page 15: ...DLPT2 Operating Instructions 15 Figure 8 Testing Installation RCD ...
Page 16: ...DLPT2 Operating Instructions 16 Figure 9 Testing Plug Top RCD ...