PPCK+™ Operation and Maintenance Manual
Page 81
©2001
DH Instruments, Inc
.
CONFIG
Purpose
Run the configuration routine to optimize the PPCK+ TPC system for changes in the
test volume.
Command “CONFIG”
Classic “CONFIG”
Remarks
Thee PPCK+ TPC configuration typically takes from 30 to 150 seconds. During this
period, no other PPCK+ operations or remote commands should take place.
All commands will result in a “BUSY” reply until the configuration is complete.
Only the “ABORT” command will function during this period and will abort the
config function. The PPCK+ pressure must be greater than 1 MPa, stable and leak
free to execute this configuration.
Example
(enhanced)
Cmd sent:
Query reply:
“CONFIG”
“CONFIG”
Example
(classic)
Sent:
Reply:
“CONFIG”
“CONFIG”
Errors
ERR# 10:
The pressure is not less than 1 MPa or the PPCK+ is not idle.
See Also
3.4.4.1
DATE
Purpose
Read or set the PPCK+ date.
Command
Query
“DATE yymmdd”
“DATE?”
Classic “DATE=yymmdd”
“DATE”
Arguments yymmdd: The
date
in the numerical only format year-month-day with
no spaces.
Remarks
The PPCK+ has an internal real time calendar clock. It is used for date
stamping calibrations.
Example
(enhanced)
Cmd sent:
Query reply:
“DATE 961201”
“961201”
Example
(classic)
Sent:
Reply:
“DATE=961201”
“961201”
Errors
ERR# 7:
Missing or improper program message argument(s).
See Also
3.4.4.4
Summary of Contents for PPCK PLUS
Page 14: ...PPCK Operation and Maintenance Manual 2001 DH Instruments Inc Page 6 N NO OT TE ES S...
Page 24: ...PPCK Operation and Maintenance Manual 2001 DH Instruments Inc Page 16 N NO OT TE ES S...
Page 76: ...PPCK Operation and Maintenance Manual 2001 DH Instruments Inc Page 68 N NO OT TE ES S...
Page 142: ...PPCK Operation and Maintenance Manual 2001 DH Instruments Inc Page 134 N NO OT TE ES S...
Page 150: ...PPCK Operation and Maintenance Manual 2001 DH Instruments Inc Page 142 N NO OT TE ES S...