Blast chiller Service Manual
43
Rev 07/04/2015
b) Remove the probe wires from the main control terminals.
c) Attach the wires from the replacement probe wires to the wires of the existing
probe.
d) From the controller side, pull the wire of the existing probe to route the new probe
wires correctly.
e) Attach the wires to the Main Board.
Needle Probe Latest Version (Effective June 2014)
A quick connection plug will allow easy
replacement of the needle probe. The
connector is 2 poles and is only used with
NTC single core needle. Touch screen
Blast Chiller are not equipped with this
quick connector as of today.
Summary of Contents for GBC-15
Page 1: ...Service Manual Blast Chiller...
Page 2: ...Rev 07 04 2015 2...
Page 3: ...Blast chiller Service Manual 3 Rev 07 04 2015...
Page 32: ...Rev 07 04 2015 32...
Page 40: ...Rev 07 04 2015 40...
Page 50: ...Rev 07 04 2015 10 20 10 0 10 20 30 40 kOhms C kOhmsVsTempChart NTC 10kOhms 25 C ZOOM...
Page 57: ...Blast chiller Service Manual 17 Rev 07 04 2015 L1 L2...
Page 91: ...Blast chiller Service Manual 51 Rev 07 04 2015 6 SCHEMATICS 6 1 SCHEME OF COMPONENTS...
Page 97: ...Blast chiller Service Manual 57 Rev 07 04 2015...
Page 100: ...Rev 07 04 2015 60...