Blast chiller Service Manual
5
Rev 07/04/2015
Electrical LOCKOUT/TAGOUT Procedure. Disconnect all circuits. Failure to comply
with this procedure can cause property damage, injury or death.
WARNING Before removing any sheet metal panels, always perform the
Electrical LOCKOUT/TAGOUT Procedure. Be sure all circuits are disconnected.
Failure to comply with this procedure can cause property damage, injury or death.
WARNING Do not operate this equipment without properly placing and securing
all covers and access panels. Failure to comply with this procedure can cause
property damage, injury or death.
WARNING Do not use or store gasoline or other flammable vapors or liquids in
the vicinity of this or any other appliance. Failure to comply can cause property
damage, injury or death.
WARNING In the event of a power failure, do not attempt to operate this
appliance. Failure to comply can cause property damage, injury or death.
General Safety
WARNING Desmon accepts no responsibility for any situation resulting from
work carried out in an unprofessional manner, or from the incorrect interpretation or
application of regulations.
General Installation
WARNING Incorrect installation or any modifications made to the appliance
may damage property or result in injury or death.
Electrical
WARNING Electrical connections or any work required on the electrical circuits
inside the appliance must be performed by certified technicians in compliance with
local, state, and federal regulations.
WARNING Make sure all facility electrical connections are in compliance with
all local and federal electrical code regulations.
Inspection and Maintenance
WARNING Appliance maintenance must be carried out by only by suitably
trained personnel.
WARNING Before any maintenance work is performed, the appliance must be
disconnected from the electrical supply. Apply a lockout tag to the electrical supply
connection.
WARNING All replacement parts that are not supplied by Desmon must be pre-
approved before installation.
Summary of Contents for GBC-15
Page 1: ...Service Manual Blast Chiller...
Page 2: ...Rev 07 04 2015 2...
Page 3: ...Blast chiller Service Manual 3 Rev 07 04 2015...
Page 32: ...Rev 07 04 2015 32...
Page 40: ...Rev 07 04 2015 40...
Page 50: ...Rev 07 04 2015 10 20 10 0 10 20 30 40 kOhms C kOhmsVsTempChart NTC 10kOhms 25 C ZOOM...
Page 57: ...Blast chiller Service Manual 17 Rev 07 04 2015 L1 L2...
Page 91: ...Blast chiller Service Manual 51 Rev 07 04 2015 6 SCHEMATICS 6 1 SCHEME OF COMPONENTS...
Page 97: ...Blast chiller Service Manual 57 Rev 07 04 2015...
Page 100: ...Rev 07 04 2015 60...