Evaporator Probe
The evaporator probe bulb is located on the evaporator output tube, tighten by a
plastic tie and wrapped by an aluminium tape.
Remove the insulation.
Remove the aluminium tape.
Cut and remove the plastic mounting tie.
Cut off the probe bulb and all wire ties.
Attach the wires from the replacement probe wires to the wires of the existing probe.
From the controller side, pull the wire of the existing probe to route the new probe wires
correctly.
Attach the wires to the Main Board.
Mount the probe into position.
Replace any wire ties.
Replace the aluminium tape.
Reinstall the insulation.
Needle Probe
Needle probe cable runs through a cable port and then through a plastic channel together
with the other cables.
a) Cut off the probe’s bulb.
DEFROST PROBE CABLE
DEFROST PROBE BULB
NEEDLE PROBE CABLE PORT
NEEDLE PROBE
ELEMENT
PLASTIC
DUCT
Summary of Contents for GBC-15
Page 1: ...Service Manual Blast Chiller...
Page 2: ...Rev 07 04 2015 2...
Page 3: ...Blast chiller Service Manual 3 Rev 07 04 2015...
Page 32: ...Rev 07 04 2015 32...
Page 40: ...Rev 07 04 2015 40...
Page 50: ...Rev 07 04 2015 10 20 10 0 10 20 30 40 kOhms C kOhmsVsTempChart NTC 10kOhms 25 C ZOOM...
Page 57: ...Blast chiller Service Manual 17 Rev 07 04 2015 L1 L2...
Page 91: ...Blast chiller Service Manual 51 Rev 07 04 2015 6 SCHEMATICS 6 1 SCHEME OF COMPONENTS...
Page 97: ...Blast chiller Service Manual 57 Rev 07 04 2015...
Page 100: ...Rev 07 04 2015 60...