![Dell SC4020 Deployment Manual Download Page 65](http://html.mh-extra.com/html/dell/sc4020/sc4020_deployment-manual_79827065.webp)
Example
Figure 51. Storage System in Legacy Mode with Dual 8 Gb Storage Controllers and One Fibre Channel Switch
1.
Server 1
2.
Server 2
3.
FC switch (Fault domain 1 and fault domain 2) 4.
Storage system
5.
Storage controller 1
6.
Storage controller 2
Next steps
Install or enable MPIO on the host servers.
NOTE: For the latest best practices, see the Dell Storage Center Best Practices document located
on the Dell TechCenter (
http://en.community.dell.com/techcenter/storage/
Labeling the Front-End Cables
Label the front-end cables to indicate the storage controller and port to which they are connected.
Prerequisites
Locate the front-end cable labels that shipped with the storage system.
About this task
Apply cable labels to both ends of each cable that connects a storage controller to a front-end fabric or
network, or directly to host servers.
Steps
1.
Starting with the top edge of the label, attach the label to the cable near the connector.
Connect the Front-End Cabling
65