Figure 18. Removing air shroud
Next steps
Installing the air shroud
Prerequisites
1. Follow the safety guidelines listed in
2. Power off the system and all attached peripherals.
3. Disconnect the system from the electrical outlet, and disconnect the peripherals.
4. Ensure that all internal cables are routed correctly and connected, and no tools or extra parts are left inside the system.
5.
6. Remove the
7. Remove the system from the rack and place it on an ESD work bench. For more information, see the
Rail Installation Guide
at
8.
.
9. If installed,
Steps
1. Align the slots on the air shroud with the guide pin on the system.
NOTE:
Route the cable properly to prevent the cable from being pinched or crimped.
2. Lower the air shroud into the system until it is firmly seated.
42
Installing and removing system components