Next steps
1.
Install the internal PERC card
2.
.
3.
4. Install the
.
5. Place the system into the rack. For more information, see the
Rail Installation Guide
6. Install the
.
7.
8. If removed,
.
9. Follow the procedure listed in
After working inside your system
134
Installing and removing system components