Riser
Form factor
Slot
CPU mapping
Slot width
Maximum power
consumption
or
OCP mezzanine slot
(slot 3)
Mezzanine
1
CPU1 Skylake-Fabric OCP MEZZ will be
occupied by SKL-F
QSFP carrier card
25 W
Riser slot (SATA M.2)
(slot 5)
Low profile
1
CPU2 Skylake or
Skylake-Fabric
PCIe connector data
lanes not used for M.
2 SATA Riser
25 W
NOTE:
For the expansion bus specification see the
.
Table 27. Supported expansion cards
Location
Card type
Form factor
Link width
Slot priority
Maximum number of
cards
Mezzanine (slot 1)
Dell HBA H330 mini
Adapter
Mezzanine
x8
1
1
Slot 5
SATA M.2
Low profile
x16
4
1
Slot 4
Intel Ethernet 10G
Dual Port X550-t
Adapter
Low profile
x4
4
1
Slot 4
Intel Ethernet X710
Dual port 10GbE SFP
+ Adapter
Low profile
x8
4
1
Slot 4
Mellanox
ConnectX-4 Lx Dual
Port 25 GbE DA/SFP
Adapter
Low profile
x8
4
1
Slot 4
Intel Gigabit Dual
Port I350-t Adapter,
1GB
Low profile
x4
4
1
Removing the expansion card riser assembly
Prerequisites
NOTE:
You must install an expansion card filler bracket over an empty expansion slot to maintain Federal Communications
Commission (FCC) certification of the system. The brackets also keep dust and dirt out of the system and aid in proper cooling
and airflow inside the system.
1
Follow the safety guidelines listed in
2
Follow the procedure listed in
Before working inside your system
.
3
from the enclosure.
Steps
1
Remove the screws that secure the expansion card riser assembly.
2
Lift the expansion card riser assembly out of the sled.
62
Installing and removing system components
Summary of Contents for E43S Series
Page 11: ...5 iDRAC MAC address information label XC6420 Series overview 11 ...
Page 51: ...Figure 9 Removing a sled Installing and removing system components 51 ...
Page 53: ...Figure 11 Installing a sled Installing and removing system components 53 ...
Page 65: ...Figure 22 Removing an expansion card Installing and removing system components 65 ...