6 Maintenance
1006-0453-000 05/04
6-7
6. Occlude the top of the standpipe tube with your finger, making sure the
tube remains 1/2 inch (15mm) above the blue seal.
7. Check the manifold pressure reading on the service screen. The MOPV
valve is functioning correctly if the steady state pressure reading is
<120cm H
2
O.
8. Set the system switch to Standby.
9. Remove the test plug from the exhalation valve port.
10. Remove the standpipe from the port and reinstall in the exhalation valve.
11. Reassemble the breathing system.
12. Perform the Preoperative Checkout Procedure in the Aestiva Operation
Manual.
Summary of Contents for Aestiva 7900 SmartVent
Page 1: ...Aestiva 5 7900 Anesthesia Ventilator Technical Reference Manual ...
Page 44: ...Notes 2 28 05 04 1006 0453 000 ...
Page 82: ...Notes 4a 36 05 04 1006 0453 000 ...
Page 116: ...Notes 4b 34 05 04 1006 0453 000 ...
Page 150: ...Notes 5 34 05 04 1006 0453 000 ...
Page 158: ...Notes 6 8 05 04 1006 0453 000 ...
Page 182: ...Notes 7 24 05 04 1006 0453 000 ...
Page 202: ...Notes 8 20 05 04 1006 0453 000 ...
Page 203: ......