3.
Moving to the top of the Ladders
, put the M20 Nut on the Threaded Bolt at the top; move
the M20 Nut down half an inch from the top of the Post.
Drawing shows connections to
make to the Top Cap, near the
top of the Posts.
Not all components shown.
4.
Put the Top Caps in place and secure the sides with two M6 x 25 Hex Bolts.
5.
Attach a M20 Nyloc Nut on each Safety Ladder until
1 in
/
25 mm
of thread is above the top of
the Top Nut.
Drawing shows the threads to
leave out above the Top Nut.
Adjust as needed.
Not all components shown.
Note
:
Do not securely tighten the Top Nut at the top of the Top Cap at this point; they can be
securely tightened after you do the final leveling to the Lift.
6.
Install the remaining Top Caps the same way.
Summary of Contents for D4-12
Page 7: ...D4 12 Series Four Post Lifts 7 P N 5900246 Rev B July 2021 Specifications...
Page 64: ...D4 12 Series Four Post Lifts 64 P N 5900246 Rev B July 2021 Labels...
Page 65: ...D4 12 Series Four Post Lifts 65 P N 5900246 Rev B July 2021...
Page 66: ...D4 12 Series Four Post Lifts 66 P N 5900246 Rev B July 2021...
Page 68: ...D4 12 Series Four Post Lifts 68 P N 5900246 Rev B July 2021...
Page 69: ...D4 12 Series Four Post Lifts 69 P N 5900246 Rev B July 2021...
Page 70: ...D4 12 Series Four Post Lifts 70 P N 5900246 Rev B July 2021...
Page 71: ...D4 12 Series Four Post Lifts 71 P N 5900246 Rev B July 2021...
Page 72: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2021 BendPak Inc All rights reserved dannmar com...