D4-12 Series Four-Post Lifts
28
P/N 5900246 — Rev. B — July 2021
Routing the Lifting Cables
The following drawing shows the routing process for all four Lifting Cables.
Top view. Not to scale. Not all components shown
.
Windows shown away from Crosstube for clarity.
The following procedure assumes you have nearby the four Lifting Cables and Sheaves you removed
prior to installing the Runways.
To route Lifting Cables A and C
:
1.
Starting with Lifting Cable A
, remove the Nut and Washer from the Threaded End (but keep
it nearby, you will need it soon).
Check the label to make sure you have the correct Lifting Cable.
Summary of Contents for D4-12
Page 7: ...D4 12 Series Four Post Lifts 7 P N 5900246 Rev B July 2021 Specifications...
Page 64: ...D4 12 Series Four Post Lifts 64 P N 5900246 Rev B July 2021 Labels...
Page 65: ...D4 12 Series Four Post Lifts 65 P N 5900246 Rev B July 2021...
Page 66: ...D4 12 Series Four Post Lifts 66 P N 5900246 Rev B July 2021...
Page 68: ...D4 12 Series Four Post Lifts 68 P N 5900246 Rev B July 2021...
Page 69: ...D4 12 Series Four Post Lifts 69 P N 5900246 Rev B July 2021...
Page 70: ...D4 12 Series Four Post Lifts 70 P N 5900246 Rev B July 2021...
Page 71: ...D4 12 Series Four Post Lifts 71 P N 5900246 Rev B July 2021...
Page 72: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2021 BendPak Inc All rights reserved dannmar com...