Contents
1.3 Approvals and Certifications
1.6 Internal Controller Functions
1.7 Enclosure Types and Power Ratings
3.1.1 Planning the Installation Site
3.1.3 Tools Required for Installation
3.2 Pre-installation Checklist
3.4.2.1 Leakage Current (>3.5 mA)
3.4.3 Gland/Conduit Entry - IP21 (NEMA 1) and IP54 (NEMA 12)
3.4.4.1 Terminal Locations: D1h-D4h
3.4.4.2 Terminal Locations: D5h-D8h
3.4.4.3 Terminal Locations: E1-E2
3.4.8 Shielding against Electrical Noise
Contents
Operating Instructions
MG16J202
Danfoss A/S © Rev. 05/2014 All rights reserved.
1
Summary of Contents for VLT FC 103
Page 2: ......