the following three (3) steps.
7. Keeping the red (+) multimeter lead on the phase 1 AC terminal, place the black (-) multimeter lead on
the DC- terminal. The measured value should be open.
8. Place the black (-) multimeter lead on the phase 1 AC terminal and the red (+) multimeter lead on the
DC+ terminal and record the results. The measured value should be open.
9. Keeping the black (-) multimeter lead on the phase 1 AC terminal, place the red (+) multimeter lead on
the DC- terminal. The measured value should be 0.275V – 0.4V.
10. Repeat Steps 6 through 9 for the remaining Inverter phases.
NOTE
These values can vary depending on the meter being used. The main idea is that the values be consistent between phases.
Figure 4-190 Inverter Diode Measurements (Skiip 613 Shown)
4.22.3 Inverter Cable Harness
Figure 4-191 Inverter Cable Harness
4.22.4 Inverter Cable Harness Removal and Installation
4.22.4.1 Inverter Cable Harness Removal
1. Isolate the compressor power as described in Section 1.8 Electrical Isolation on page 22.
2. Remove the Service Side Cover. Refer to Section 4.1.3.1 Service Side Cover Removal and Installation on
3. Remove the Soft Start. Refer to Section 4.14.3 Soft Start Removal and Installation on page 117.
4. Use two (2) fingers to simultaneously push outward on the Inverter Cable Harness latches. Refer to
Figure 4-192 Harness Removal from Inverter on page 178.
M-SV-001-EN Rev. H-1/23/2023 Page 177 of 294
Summary of Contents for Turbocor TT Series
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK Page 2 of 294 M SV 001 EN Rev H 1 23 2023...
Page 14: ...Page 14 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 16: ...Page 16 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 18: ...Figure 1 2 New Type Code Page 18 of 294 M SV 001 EN Rev H 1 23 2023...
Page 46: ...Page 46 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 250: ...Page 250 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 268: ...Figure 5 3 Bearing Calibration Flow Page 268 of 294 M SV 001 EN Rev H 1 23 2023...
Page 274: ...Page 274 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 286: ...Page 286 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 290: ...Page 290 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 292: ...Page 292 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...