background image

Instructions

© Danfoss | DCS (CC) | 2018.11  | 5

FRCC.PI.061.A1.02

1 – Introduction

This instruction applies to fan-cooled condensing 

units for the refrigerant R290 (or similar 

inflammable gases).

During service only the refrigerant type stated on 

the condensing unit must be used.

2 – Versions

Version N0: for solder connection, has a nitrogen 

holding charge and is designed for use in 

refrigeration systems with capillary tube.

Version A09: for solder connection, has a 

helium/dry air holding charge and is designed 

for use in refrigeration systems with tubes for 

pressostats and premounted bracket. This version 

has premounted wired electrical box and one 

schrader port.

Version A10: for solder connection, has a 

nitrogen holding charge and is designed for 

use in refrigeration systems with premounted 

pressostats (HP and LP switch). This version has 

premounted wired electrical box, combo filter 

drier/receiver and one schrader port.

Version A11: for solder connection, has a 

nitrogen holding charge and is designed for use 

in refrigeration systems with capillary tube. This 

version has premounted wired electrical box and 

one schrader port.

3 – Refrigerant charging

 With regard to evacuation and charging an 

condensing unit is to be treated as a compressor. 

Refrigerant charging must take place from 

a charging board not contaminated with 

refrigerants containing chlorine. No valves or flare 

connections of any kind must be used.

The condensing unit must be hermetically sealed, 

i.e. all connections must be soldered. After 

charging all solderings/connections are to be 

checked for leaks with a leak detector.

 

Keep away flammables from the condensing 

unit.

4 – Installation

 •  Install the condensing unit in the foreseen 

location.

 •  Prepare the tube connections from the 

evaporator.

 •     Use a drier with molecular sieves suitable 

for R290 (for versions N0, A09, A11).

 •     Use only dry and clean components and 

avoid moisture entering the system.

 •  The system components must not contain any 

chlorine, mineral oil or other oily substances.

5 – Electrical connections

Fig. 1 (relay) / Fig. 2 (relay) / Fig. 3 (PTC):

1A: Main winding

1B: Start winding

1C: Start relay

1D: Winding protector (Internal)

1E: Start capacitor

1F: Bleeder resistor

1G: Run capacitor

1H: Thermostat or Pressure control

1J: Fan

1K: Pressostat (HP/LP)

1L: PTC

Fig. 5.

 Wiring diagram for the series NB.

Fig. 6.

 Wiring diagram for the series NL, NB, NX.

Fig. 7.

 Wiring diagram for the series NS. 

Fit the terminal board cover.

Pressure switches (A10 version is premounted 

with HP/LP pressostats) and thermostats must 

also be mounted in an IP64 or higher classified 

box. Keep away flammables from the electrical 

equipment.

6 – Safety

 •  

Disconnect the main power supply before 

service or repair.

 •  All connections at installation location must 

confirm with standard NFC15-100 in france or 

local and national standards/codes enforce in 

the country.

 

• 

 

Follow the information stated as per 

EN/IEC 6024/60335-2-89.

7 – Declaration of conformity

 •  All our condensing units are complied with 

low voltage directive  2014/35/EU and must be 

incorporated during installation.

 •  

Low Voltage Directive 2014/35/EU

 

EN 60335-1:2012 + A11:2014- Household and 

similar electrical appliances-Safety-Part 1: 

General requirements-for all above mentioned 

condensing units with compressor platforms NL, 

NP, NX, NS, NT, SC, NL and NB.

 •  

Eco-design DIRECTIVE 2009/125/

EC,

  establishing a framework for the setting 

of Eco-design requirements for energy-related 

products

 •  

REGULATION (EU) 2015/1095,

 implementing 

Eco-design Directive 2009/125/EC with regard 

to Eco-design requirements for professional 

refrigerated storage cabinets, blast cabinets, 

condensing units and process Chiller.

 •  

Condensing unit measurements are made 

according to standard “EN 13771-2:2007” 

–  Compressor and condensing units for 

refrigeration-performance testing and test 

methods- part 2: Condensing units

 •  The following approvals must be obtained 

through authorised institutes like Nemko, 

Demko, BEAB, LCJE, etc. Among others EN 60 

335-2-24, IEC 335-2-89, IEC 79-15.

8 – Maximum refrigerant charges R290 

units with and without receiver

 •  

The maximum charging amount must not 

exceed 150 g.

 •   It is recommended to charge only the amount 

necessary for the operation of the refrigeration 

system.

 •  The charging amount must be adapted to suit each 

system type.

 •  The condensing temperature must not exceed 55°C 

(N0 versions), 60°C (A09, A10, A11 versions) for 

stationary operation and 65°C for peak load.

9 – Cold start

The compressor must be allowed to assume a 

temperature higher than 10°C before it is started 

for the first time. This will prevent possible start 

problems caused by too high oil viscosity.

At lower temperatures some tripping of the 

winding protector may be expected until the 

viscosity of the oil becomes reduced.

10 – Winding protector

The compressors have a built-in winding 

protector. If the winding protector cuts out 

whilethe compressor is cold it may take approx. 5 

minutes for the protector to reset. If the winding 

protector cuts out while the compressor is hot 

(compressor housing above 80°C) up to 45 

minutes may pass before the protector resets.

The winding temperature must never exceed 

130°C.

Checking the winding protector

In the event of compressor failure a check must 

be made by resistance measurement directly on 

the current lead-in to find out whether the fault 

is due to motor damage or simply a winding 

protector trip.

Location of the winding protector in the 

electrical circuit.

1A: Main winding

1B: Start winding

1D: Winding protector

If resistance measuring or a test lamp shows 

that there is a connection through the motor 

windings from point M to point S, but a broken 

circuit between points M and C or S and C, this 

indicates that the winding protector has cut out. 

Therefore, wait for the protector to reset.

12 – Service instructions

When emptying a defective system the 

refrigerant must be collected without mixing in 

other refrigerants.

Evacuation must take place until a vacuum of 

1 mbar or lower is reached. Blow through the 

refrigeration system with dry nitrogen.

The drier must always be replaced when a system

is opened.

Service on these installations must only be done 

by expert installers with thorough knowledge of 

inflammable gases like e.g. propane.

See also Installation .

13 – Warnings

 

For tube connections

!

8545

4-

22

18

R290

Summary of Contents for Optyma Series

Page 1: ...onal range 220 240V 50Hz for R290 Propane Danfoss DCS CC 2018 11 FRCC PI 061 A1 ML 1 English English p 5 Dansk Danish p 6 Deutsch German p 7 Fran ais French p 8 Espa ol Spanish p 9 Svenska Swedish p 1...

Page 2: ...11 10 13 14 12 11 1 1 2 2 N N L L M 1L 1B 1D 1J 1H 1A N N L C M C S M S C 1A 1D 1B Fig 4 Fig 1 Fig 2 Fig 3 4 2 2 1 8 R290 Fig 5 1A 1B 1D 1H 1J 1K 1E 1C Compressor range NS34 1A Main winding 1B Start...

Page 3: ...1H 1E 1G 1B 1A 1D 1F 1C 1J 1K 1H 1E 1C 1B 1A 1D Compressor range NL and NP and NX Compressor range NBC30 1A Main winding 1B Start winding 1C Start relay 1D Winding protector 1E Start capacitor 1F Blee...

Page 4: ...ndensing unit code number B Production serial number C Refrigerant D Model number E Power supply for compressor fan motor Compressors Max permissible refrigerant charge g Group of condenser Condenser...

Page 5: ...nstallation Low Voltage Directive 2014 35 EU EN 60335 1 2012 A11 2014 Household and similar electrical appliances Safety Part 1 General requirements for all above mentioned condensing units with compr...

Page 6: ...ndingsdirektivet 2014 35 EU og skal integreres under montering Lavsp ndingsdirektivet 2014 35 EU EN 60335 1 2012 A11 2014 Elektriske apparater til husholdningsbrug o l Sikker hed Del 1 Generelle krav...

Page 7: ...ere Verdichtungss tze erf llen die Vorgaben der Niederspannungsrichtlinie 2014 35 EU und sind w hrend der Installation zu integrieren Niederspannungsrichtlinie 2014 35 EU EN 60335 1 2012 A11 2014 Haus...

Page 8: ...s pendant l installation Directive basse tension 2014 35 UE EN 60335 1 2012 A11 2014 Appareils lectrodomestiques et analogues S curit Partie 1 exigences g n rales pour tous les groupes de condensatio...

Page 9: ...sobre baja tensi n 2014 35 UE EN 60335 1 2012 A11 2014 Seguridad en electrodom sticos y equipos similares parte 1 requisitos generales para todas las unidades condensadoras mencionadas anteriormente c...

Page 10: ...Deklaration om verensst mmelse Alla v ra luftkylda aggregat uppfyller kraven i l gsp nningsdirektivet 2014 35 EU och m ste byggas in i samband med installation L gsp nningsdirektivet 2014 35 EU SS EN...

Page 11: ...tijdens de installatie worden ge ntegreerd Laagspanningsrichtlijn 2014 35 EU EN60335 1 2012 A11 2014 Huishoudelijkeen soortgelijke elektrische toestellen Veiligheid Deel 1 Algemene eisen voor alle hi...

Page 12: ...C 6024 60335 2 89 mukaisesti 7 Vaatimustenmukaisuustodistus Kaikkikoneikkommeovatpienj nnitedirektiivin 2014 35 EU vaatimusten mukaisia ja ne on integroitava asennuksen yhteydess Pienj nnitedirektiivi...

Page 13: ...NX NB NL 6 NS 7 A10 IP64 HP LP 6 NFC15 100 EN IEC 6024 60335 2 89 7 2014 35 EU 2014 35 EU EN 60335 1 2012 A11 2014 NS NX NP NL NB NL SC NT 2009 125 EC 2015 1095 2009 125 EC EN 13771 2 2007 LCJE BEAB...

Page 14: ...14 Danfoss DCS CC 2018 11 FRCC PI 061 A1 ML...

Reviews: