Instruction | MPE 70 energy recovery device
49
180R9426 | AQ367027814446en-000801 | IOM MPE 70 | 08.2022
8.
Installing and
alignment
The bracket is attached to the MPE 70 unit by
four x M10 bolts each side, positioned in the
center of the sleeve, for later adjustments.
Tighten the bolts - see section 6.2.
Lift the unit with motor and bracket using suit-
able crane or winch.
We recommend the spool piece for HP out to be
installed to the manifold before installing the
MPE 70 unit on the rail.
Place the unit on the rail. Both sides of the brack-
et must grip the rail before lowering the unit.
Slide the bottom piece of the bracket up to grip
the rail. Allow for some play. Hand tighten the
screws on the bottom bracket to allow for adjust-
ment during alignment
8.1 Installing the MPE 70 on the rail
The rail and MPE 70 must be aligned with the
manifolds to avoid stress or bending.
Misalignment may cause stress and/
or damage to the Victaulic connec-
tions
The HPout connector is aligned first. Then the
spool piece for the HPin side can be manufac-
tured to length. The LP piping is mounted last.
Start with aligning the first unit on the rail, then
the last unit and then the units in between until
all the units have been aligned.
Do not pressurize the units without
proper alignment
After aligning secure the unit on the
rail by tightening all the screws incl.
the safety screws
with the speci-
fied torque, see section 6.2.
Safety
screws
8.2 Alignment of the units on the rail
Summary of Contents for MPE 70
Page 25: ...Data sheet Energy Recovery Device MPE 70 hpp danfoss com...
Page 53: ...Parts list Energy recovery device MPE 70 hpp danfoss com...
Page 58: ...Danfoss DCS im 2022 08 AX367028596447en 000301 58...
Page 59: ...M a n u a l Electric Motors Motor Manual hoyermotors com...
Page 63: ...63 180R9426 AQ367027814446en 000801 IOM MPE 70 08 2022...