Instruction | MPE 70 energy recovery device
44
180R9426 | AQ367027814446en-000801 | IOM MPE 70 | 08.2022
4.
Assembling MPE 70 to
electric motor
4.1 Installing support feet
The motor can be installed either before or after
the MPE unit is placed on the rail. If it is not
installed on the rail, the MPE 70 is positioned
vertically by installing the four support feet from
the tool set.
Tighten the bolts with 30 Nm.
4.2 Bell housing and coupling
The MPE 70 is connected to the electric motor by
the bell housing and a flexible coupling. See
section 2. Main parts
The bell housing and coupling can be supplied
by Danfoss.
For other suppliers of the bell housing:
The MPE 70 shaft and motor shaft should be
aligned within 0.2 mm / 0.008 in.
0.2 mm [0.008 in]
Summary of Contents for MPE 70
Page 25: ...Data sheet Energy Recovery Device MPE 70 hpp danfoss com...
Page 53: ...Parts list Energy recovery device MPE 70 hpp danfoss com...
Page 58: ...Danfoss DCS im 2022 08 AX367028596447en 000301 58...
Page 59: ...M a n u a l Electric Motors Motor Manual hoyermotors com...
Page 63: ...63 180R9426 AQ367027814446en 000801 IOM MPE 70 08 2022...