Instruction | MPE 70 energy recovery device
48
180R9426 | AQ367027814446en-000801 | IOM MPE 70 | 08.2022
6.3 Adjustment possibilities for the bracket
7.
Connecting the MPE 70
to the manifolds
7.1 Pipe connections
The MPE connection ports are designed for
hard piping. Danfoss recommends following
the Guideline 180R9367 - Pipe connection. This
guideline is based on the use of Victaulic® Style
77 Flexible Coupling.
Spool pieces must be manufactured according to
the “Victaulic® (OGS) cut groove specifications”
or similar.
To allow for inaccuracies in the manifolds and
to ensure an easy installation we recommend
mounting a spool piece with a minimum length
of 80 mm on the HP-out connection.
7.2 Manifolds
The manifolds must have enough support to
prevent them from moving when getting pres-
surized.
The manifolds must be clean inside before con-
necting them to the MPE 70.
The Danfoss bracket allows for ajustment in X-,
Y-, Z- direction during the alignment proces.
X
X
X
X
Y
Z
Max. 15 mm
Summary of Contents for MPE 70
Page 25: ...Data sheet Energy Recovery Device MPE 70 hpp danfoss com...
Page 53: ...Parts list Energy recovery device MPE 70 hpp danfoss com...
Page 58: ...Danfoss DCS im 2022 08 AX367028596447en 000301 58...
Page 59: ...M a n u a l Electric Motors Motor Manual hoyermotors com...
Page 63: ...63 180R9426 AQ367027814446en 000801 IOM MPE 70 08 2022...