29
Mounting
EN
RoCon UFH
5.3.3
Connecting the thermostatic actuators
5.3.4
Mounting and connecting room controllers
Preparing mounting
If you want to install several products, create an installation plan with the individual
installation sites. Label the individual products according to the installation plan
with a number or the designation of the installation site in order to reduce the pos-
sibility of confusion.
In the case of room controller wireless
(1)
:
Prior to mounting, verify that the solar-operated energy storage module has
been charged.
- Regular daylight is sufficient for charging the energy storage module.
- Exposure to direct sunlight reduces the charging time.
- In dark environments of the installation site: If the daylight is less than
200 Lux, install a lithium battery 3V type 1632 in the battery compartment:
1. Remove the rotary knob and the upper part of the housing (see fig. 5-11)
2. Insert the battery into the battery compartment. Verify correct polarity.
1. Route the cables of the thermostatic
actuators through the strain reliefs (A)
and connect the wires to the corre-
sponding terminals (observe colour
coding).
2. Push the stripped wires into the termi-
nals all the way to the stop.
3. In the case of flexible wires or for dis-
connecting wires, push the catch (B).
Fig. 5-9: Connecting actuators
(1)
The wireless system is only available in certain sales areas.
A
B
Summary of Contents for RoCon UFH
Page 2: ......
Page 27: ...25 Mounting EN RoCon UFH 6 Refit the cover and close it Fig 5 5 Closing the cover ...
Page 64: ......
Page 126: ......
Page 151: ...25 Montage FR RoCon UFH 6 Accrocher le couvercle et le fermer Fig 5 5 Fermer le couvercle ...
Page 188: ......
Page 213: ...25 Montage NL RoCon UFH 6 Haak de afdekking vast en sluit haar Afb 5 5 Afdekking sluiten ...
Page 250: ......
Page 312: ...008 1706699 00 12 2020 Copyright Daikin www daikin eu ...