32
Mounting
EN
RoCon UFH
6. Turn the cam screw at the
room controller counter-
clockwise by approximately
90° using a screwdriver.
7. Refit the upper part of the
housing and the rotary knob.
Fig. 5-13: Assembly upper part of housing
8. Connect the wires of the
cable of the room tempera-
ture controller to the termi-
nals of the corresponding
heating circuit at the product
(observe colour coding).
Fig. 5-14: Connecting the room temperature controller wired
9. Route the cable through the
cable guide (B) at the rear of
the product.
10. Fix the cable of the room
temperature controller and
the cable of the thermostatic
actuator with the cable clamp
(A).
11. Repeat this procedure for all
other cables.
Fig. 5-15: Routing cables
90°
A
B
Summary of Contents for RoCon UFH
Page 2: ......
Page 27: ...25 Mounting EN RoCon UFH 6 Refit the cover and close it Fig 5 5 Closing the cover ...
Page 64: ......
Page 126: ......
Page 151: ...25 Montage FR RoCon UFH 6 Accrocher le couvercle et le fermer Fig 5 5 Fermer le couvercle ...
Page 188: ......
Page 213: ...25 Montage NL RoCon UFH 6 Haak de afdekking vast en sluit haar Afb 5 5 Afdekking sluiten ...
Page 250: ......
Page 312: ...008 1706699 00 12 2020 Copyright Daikin www daikin eu ...