Operating instructions
34
Daikin RoCon
Daikin Control unit
008.1543999_00 – 03/2017 – EN
5
x
Parameter overview
5
Parameter overview
5.1
For first commissioning or resetting to factory settings
Tab. 5-1 "Basic Configuration" parameters
The parameters listed in this section can only be
accessed when the device is commissioned for the first
time or if it is fully reset.
During initial commissioning:
After resetting to factory settings:
●
Rotary switch setting: Info
●
Resetting to factory settings.
(see chap. 3.6.6 - Option 3)
●
Rotary switch setting: Info
●
Switch on the power supply to the device and switch on the
main switch.
Language
Use
Standard Config
Yes
No
Basic Configuration
Boiler Function
Unmixed Circ Config
BUS ID HS
Time Master
System Config