Operation
Daikin RoCon
Daikin Control unit
008.1543999_00 – 03/2017 – EN
Operating instructions
17
3.4.8 System settings
In the
"Configuration"
rotary switch setting, the basic set-
tings of the RoCon BF control unit as well as the system configu-
ration for the installation environment of the Daikin heat genera-
tor, the direct heating circuit, the hot water generation and any
optionally connected components are carried out.
Depending on the access authorisation (user or expert), different
parameters are available. Several parameters can only be ac-
cessed by the heating expert.
Setting the language, date and time
●
Set the rotary switch to the
"Configuration"
position.
An overview is displayed.
●
Use the rotary button to select the
"Setup"
level.
An overview is displayed.
●
Use the rotary button to select the [Language], [Date], [Time]
or [Summertime] parameters and confirm.
●
Use the rotary button to select and change the value to be
changed within the respective display.
●
Confirm the selection with a brief push of the rotary button.
The change has been accepted. Jump back to the previ-
ous display.
Detailed explanations and possible setting values of this rotary switch setting can be
found in chap. 3.6 and in chap. 6.2.
3.4.9 Terminal function
In the
"Remote Param"
rotary switch setting, other devices
(mixer module control unit or heat generator control components)
integrated in the RoCon system via the CAN bus can also be op-
erated and parametrised as long as the respective control unit
has the required authorisation (see also chap. 4.3).
The local control unit functions as a remote control for the ex-
ternal device. In this case, all the control functions are performed
and saved 1:1 as on the external device.
The different application and parametrisation options for the use
of the devices and control units in the RoCon system connected
via the CAN bus are described in chap. 4.3.
An internally pre-programmed calendar ensures an au-
tomatic timeshift for the annually repeating sum-
mertime/wintertime changeover dates. If required, the
automatic timeshift can be switched off.
A list of the recognised devices
is displayed for selection on the
display after activation of the
"Bus - Scan" (external devices
and local device).
After selection and confir-
mation of an external device,
the terminal function for this
device is activated and the as-
sociated standard display for
this device is shown on the
display.
The operating component is
then in terminal operation.
Fig. 3-9
Display of the "Remote
Param" level during
commissioning or after
interim disconnection
from the mains
Remote Param
Bus - Scan
No selection
B1
RoCon B1 control unit of the heat generator
Bus
CAN bus (connection line between RoCon devices
and control units)
H
1
Direct heating circuit (e.g. radiators)
H
2
Mixed heating circuit (e.g. floor heating)
M1
EHS157068 mixer module
U1
EHS157034 room station
WE1
Heat generator
Fig. 3-10 Example of "Bus - Scan" on a heating system with 1 heat gen-
erator, 1 mix valve, 1 room station and activation of the termi-
nal function for remote control of the mixer module
Remote Param
Bus - Scan
No selection
Remote Param
Bus - Scan
No selection
Remote Param
No selection
Contr BM1/BE1 #1
Mix Valve #0
Remote Param
Contr BM1/BE1 #1
Mix Valve #0
Remote Param
Contr BM1/BE1 #1
Mix Valve #0