Installation of indoor unit
EDUS281008
30
Installation of indoor / outdoor unit
3P250363-3B
English
6
REFRIGERANT PIPING WORK
5.
〈
Observe the requirements listed below for refrigerant
piping sizes.
〉
Liquid
Gas
3/8 in.
5/8 in.
〈
Execute heat insulation work completely on both sides of
the gas piping and the liquid piping or else a water leak-
age might result.
Failing to insulate the pipes may cause leaking or burns.
"ESURETOUSEINSULATIONTHATISDESIGNEDFORUSEWITH(6!#
3YSTEMS
Reinforce the insulation on the refrig
ERANT
piping according to the installation environment. If
the temperature or humidity in the product installation
location might reach 86°F or 80%, respectively.
Condensation may form on the surface of the insulation.
〉
CAUTION
Follow the points at below.
Use a tube cutter and fl are suitable for the type of refriger-
•
ant.
To prevent dust, moisture or other foreign matter from infi l-
•
trating the piping, either pinch the end or cover it with tape.
Do not allow anything other than the designated refrigerant
•
to get mixed into the refrigerant circuit, such as air. If any
refrigerant gas leaks while working on the unit, immediately
ventilate the room.
Cut off the spin closure.
(1)
The outdoor unit is charged with refrigerant.
•
This coil contains gas under 150 P.S.I.G.
•
Release pressure from the gas piping pressure-release
device before initiating piping work.
Detail
Cap
After the work is finished,
try to repair.
Sharp object
Gas piping
Front panel
Liquid piping
Pressure
release device
(2) Push
(1) Remove
Cut off the pipe end with a tube cutter.
•
(Both liquid line and gas line)
Cut
wi
th
a
tu
be
cutt
er
Connect the piping.
(2)
Remove the upper and lower front panels.
1.
Slide the front panel (lower) along the fi eld piping until it
2.
is far enough away that it will not be affected by heat
from brazing, as shown in Fig. 3.
Braze up to the fi eld piping fi tting port while cooling the
3.
sensor and the thermal insulation.
Close the upper and lower front panels once heat from
4.
the brazed areas has dissipated.
NOTE
When brazing the fi eld piping, cover the pipe insulation and
•
the thermal sensor inside the insulation with a damp cloth to
prevent any damage to the sensor or the insulation. Other-
wise, the sensor may be damaged by heat of brazing, which
lead to a failure of normal operation.
F
ie
l
d
p
i
p
ing
f
i
tt
ing
po
r
t (
bra
z
ed
)
F
ie
l
d
p
i
p
ing
Fig. 3
After the work is fi nished, make sure to check that
(3)
there is no gas leak.
After checking for gas leaks, be sure to insulate the
(4)
piping connections referring to Fig. 4.
Do
n
ot l
ea
v
e
a
ga
p
G
as
p
i
p
ing
P
i
p
ing
h
ea
t
ins
ul
a
t
i
o
n
ma
t
eria
l
L
i
qu
id
p
i
p
ing
Air
h
and
l
er
Fig. 4
Summary of Contents for FTQ-PA
Page 1: ...EDUS281008 Split System Air Conditioners Air Handling Unit FTQ PA RZQ P9 ...
Page 12: ...EDUS281008 Dimensions and service space FTQ PA RZQ P 9 1 3D06421 ...
Page 15: ...Piping diagrams EDUS281008 12 FTQ PA RZQ P 5 2 Outdoor unit RZQ18PVJU9 RZQ24PVJU9 3D062238B ...
Page 20: ...EDUS281008 Electrical characteristics FTQ PA RZQ P 17 1 7 2 Electric heater ...