Installation of indoor unit
Installation of indoor / outdoor unit
31
2
3P250363-3B
7
English
CAUTION
Be sure to insulate any fi eld piping all the way to the piping
•
connection inside the unit. Any exposed piping may cause
condensation or burns if touched.
When brazing the refrigerant piping, perform nitrogen re-
•
placement fi rst, or perform the brazing while feeding nitro-
gen into the refrigerant piping. (
Refer to Fig. 5
)
Refrigerant piping
Part to be brazed
Taping
Pressure-reducing valve
hands
valve
Nitrogen
Nitrogen
F
i
g
.
5
CAUTION
When brazing piping while feeding nitrogen inside the
•
piping, make sure to set the nitrogen pressure to 2.9 psi or
less using the pressure reducing valve.
(This pressure is such that a breeze is blown to your cheek.)
DANGER
Use of oxygen could result in an explosion resulting in
•
serious injury or death. Only use dry nitrogen gas.
Refrigerant gas may produce toxic gas if it comes in contact
•
with fi re such as from a fan heater, stove or cooking device.
Exposure to this gas could cause severe injury or death.
NOTE
Do not use fl ux when brazing refrigerant piping. Therefore,
•
use the phosphor copper brazing fi ller metal (BCuP) which
does not require fl ux.
Flux has an extremely negative effect on refrigerant piping
systems. For instance, if chlorine based fl ux is used, it will
cause piping corrosion. Flux containing fl uorine will damage
refrigerant oil.
DRAIN PIPING WORK
6.
CAUTION
Make sure all water is out before making the duct connection.
•
Install drain piping as described Fig. 6.
(1)
Secondary drain piping connection hole
Primary drain piping connection hole
In
c
a
s
e of vert
ic
al
i
n
s
tallat
i
on
F
i
g
.
6
-1
Primary drain piping connection hole
Remove the cover
Secondary drain piping
connection hole
Reinstall the cover.
In
c
a
s
e of hor
i
zontal
i
n
s
tallat
i
on
F
i
g
.
6
-2
Perform drain work so that the unit is drained thoroughly.
•
(Be sure to insulate the following 2 locations since
condensation may cause water leakage.)
Drain piping
•
Drain socket
•
The drain pan has connections for a primary and sec-
•
ondary drain.
Use 3/4 PVC piping for drain piping connections.
•
Keep piping runs short with a downward slope of at
•
least 1/100 to prevent air pocket from forming.
Be sure to install a drain trap at the drain outlet since
•
the inside of the unit is at negative pressure relative to
atmospheric pressure during operation.
Knock out the plastic seal with a screwdriver and a
•
hammer.
(Refer to Fig. 7)
NOTE
In case of horizontal installation, carefully knock out the
•
plastic seal. Operation without opening the drain piping
connection hole causes water leakage.
Summary of Contents for FTQ-PA
Page 1: ...EDUS281008 Split System Air Conditioners Air Handling Unit FTQ PA RZQ P9 ...
Page 12: ...EDUS281008 Dimensions and service space FTQ PA RZQ P 9 1 3D06421 ...
Page 15: ...Piping diagrams EDUS281008 12 FTQ PA RZQ P 5 2 Outdoor unit RZQ18PVJU9 RZQ24PVJU9 3D062238B ...
Page 20: ...EDUS281008 Electrical characteristics FTQ PA RZQ P 17 1 7 2 Electric heater ...